ELENA A (ΕΛΕΝΑ Α)
-Agios Fanourios Ferries (2019-2024)
Built in 2009 (age 15). Was registered in Piraeus. Current line: None in Greece, sold overseas, reportedly to a Russian company
The double-ended ferry ELENA A was ordered in 2008 by the Salamina-based company Nikolaïdis NE. She was due to be completed under the name AGIOS FANOURIOS I, but she was sold, while still under construction, to Agios Fanourios Ferries, who completed her in 2009 in Greece. She was renamed ELENA A and entered service on the Perama-Salamina line. After 13 years, she she moved to the Rion-Antirrion line in 2022, and remained there for two seasons. In 2024 she was reportedly sold to a Russian company, having presumably been renamed PANAGIYA.
PHOTOS (2019, 2021, 2022):
The ELENA A seen resting in Salamina (7/2019).
The ELENA A seen resting in Salamina (7/2019).
The ELENA A seen resting in Salamina (7/2019).
The ELENA A docked in Salamina (8/2021).
The ELENA A docked in Salamina (8/2021).
The ELENA A docked in Salamina (8/2021).
The ELENA A seen resting in Salamina (8/2021).
The ELENA A seen resting in Salamina (8/2021).
The ELENA A seen resting in Salamina (8/2021).
The ELENA A in Salamina (8/2021).
The ELENA A seen docked in the port of Antirrion (10/2022).
The ELENA A seen docked in the port of Antirrion (10/2022).
The ELENA A seen docked in the port of Antirrion (10/2022).
The ELENA A seen resting in Antirrion (10/2022).
The ELENA A seen resting in Antirrion (10/2022).